Two-storey villa with pool

Learn more · from 1200 €

Design office in Montenegro

Architectural design and technical drawings in Montenegro

From a sketch to a building permit — a house, a canopy, stairs, a barbecue or a memorial. You get a price within 1 hour, in English, Russian or Montenegrin.

  • Eurocode-based calculations (MEST EN)
  • Signed and reviewed by licensed partners
  • Online across Montenegro

What worries you?

These are the questions we hear most. Short answers.

How much does it cost?
A fixed price per stage, agreed in the contract. See a ballpark right away in the calculator. Learn more
How long will it take?
Workshop drawings in 1–3 days, concept design in 2–4 weeks. Deadlines are in the contract. Learn more
Will the municipality accept it?
We design to the UTU and the valid plan, and pre-check what the chief city architect usually sends back. Learn more
Who is responsible?
A contract with a Montenegrin company, signed and reviewed by a licensed engineer. Corrections are free. Learn more
I don't speak Montenegrin
We talk to you in English or Russian; documents for authorities are in Montenegrin. Learn more
Will my builder understand it?
Workshop drawings with material lists, cutting plans and joints. DXF for plasma and laser. Learn more

How we work

  1. 1BriefYou send a sketch, photo or description15 min
  2. 2Price & deadlineFixed offer and contract1 hour
  3. 3ConceptFirst version for approval1–10 days
  4. 4DocumentationDrawings, calculations, specs1–30 days
  5. 5DeliveryPDF/DWG/DXF + support during constructionon time

Cost calculator

Five steps to a ballpark price. The exact price arrives within 1 hour.

Step 1 of 5

What are we designing?

Building permit in Montenegro — step by step

UTU, concept design, chief city architect approval, main design, review, filing. What, who and how long.

Read the guide
  1. Plot and plan check1–5 days
  2. Urban-technical conditions (UTU)varies by municipality
  3. Topographic survey3–10 days
  4. Concept design (idejno rješenje)2–4 weeks
  5. Chief city architect approvaltypically 15–30 days
  6. Main design (glavni projekat)3–8 weeks
  7. Review and filing2–4 weeks

FAQ

How much does a house design cost in Montenegro?

It depends on floor area and stage. The calculator gives a ballpark; we confirm a fixed price after reviewing the UTU and your brief.

Can you work from a photo?

Yes. With one known dimension (e.g. table height) we scale the rest and confirm with you.

Can I order drawings only?

Yes. We design; any welder or shop can fabricate.

Can a foreigner get a building permit?

Yes, a plot owner — individual or company — can build with the required documents.

How long does it take overall?

For a family house, realistically 3–6 months from UTU to breaking ground, depending on the municipality.

Can any building be legalised?