Steel hall and warehouse design

A hall is where design saves the most: an optimised frame can use noticeably less steel than a “safe” by-eye solution.

We calculate to Eurocode 3, draw footings, anchors and every shop detail, and coordinate the other volumes for the main design.

What you get

  • Frame calculation
  • Footings and anchors
  • Erection drawings
  • Shop drawings
  • Steel schedule by weight

What we need from you

  • Dimensions and height
  • Use and equipment (crane, racking)
  • Location

Stages and timing

#Stages and timing
1Frame concept2–3 days
2Calculation3–7 days
3Drawings5–10 days

Common mistakes and rejection reasons

  1. Excess steel from an unoptimised frame
  2. Crane or equipment loads ignored
  3. Footings without soil data

FAQ

How much is a hall design?

It depends on area; for halls up to 500 m² usually €800–2,500.

Do you do the full main design?

Yes, with all volumes and review.

Can you check an existing hall?

Yes — for an extension, new equipment or legalisation.