MEP design for houses and buildings in Montenegro

The main design isn’t complete without services. We design plumbing and drainage, heating and cooling, ventilation and electrical — in-house or with trusted licensed partners, with one contract and one contact for you.

All disciplines are coordinated with each other and the architecture, so nobody drills through a beam on site.

What you get

  • Schematics and layouts
  • Hydraulic and heat-load calculations
  • Equipment schedule
  • Coordination with structure

What we need from you

  • Architectural plans
  • Utility connection conditions
  • Equipment preferences

Stages and timing

#Stages and timing
1Connection conditions review1–3 days
2Calculations3–7 days
3Drawings and schedules5–15 days

Common mistakes and rejection reasons

  1. Missing connection conditions
  2. Routes through load-bearing elements
  3. Septic tank not sized

FAQ

Do you do all disciplines?

We coordinate all; some in-house, some by licensed partners — you have one contract and one contact.

Do I need a septic tank design?

Where there is no public sewer — yes, as part of the main design.

Can you do MEP for someone else’s architecture?

Yes, given DWG plans.

Send us your task

A paper sketch, a photo or a picture from the internet — all fine. We reply within 1 hour on working days.

Reply via