MEP design for houses and buildings in Montenegro
The main design isn’t complete without services. We design plumbing and drainage, heating and cooling, ventilation and electrical — in-house or with trusted licensed partners, with one contract and one contact for you.
All disciplines are coordinated with each other and the architecture, so nobody drills through a beam on site.
What you get
- Schematics and layouts
- Hydraulic and heat-load calculations
- Equipment schedule
- Coordination with structure
What we need from you
- Architectural plans
- Utility connection conditions
- Equipment preferences
Stages and timing
| # | Stages and timing | |
|---|---|---|
| 1 | Connection conditions review | 1–3 days |
| 2 | Calculations | 3–7 days |
| 3 | Drawings and schedules | 5–15 days |
Common mistakes and rejection reasons
- Missing connection conditions
- Routes through load-bearing elements
- Septic tank not sized
FAQ
Do you do all disciplines?
We coordinate all; some in-house, some by licensed partners — you have one contract and one contact.
Do I need a septic tank design?
Where there is no public sewer — yes, as part of the main design.
Can you do MEP for someone else’s architecture?
Yes, given DWG plans.
Related services
Architectural designHouses, villas, apartment buildings, renovations and extensions — from concept to main design.Structural designFoundations, reinforced concrete, retaining walls, roofs — Eurocode calculations and rebar drawings.Legalisation & as-builtAs-built survey, technical report and documents for legalisation and registration.
Send us your task
A paper sketch, a photo or a picture from the internet — all fine. We reply within 1 hour on working days.