Renovation and extension design in Montenegro

For an existing building we first check two things: what the plan allows and whether the structure can carry the new load. Only then do we design.

Survey, structural check and the design of changes — all in one contract.

What you get

  • As-built survey
  • Structural check and strengthening
  • Design of changes
  • Phasing without removing load-bearing walls
  • Filing documents

What we need from you

  • Property title sheet
  • Photos and any existing drawings
  • What you want to change

Stages and timing

#Stages and timing
1Site visit and survey1–5 days
2Structural check3–7 days
3Design1–4 weeks

Common mistakes and rejection reasons

  1. Extra storey without checking the foundations
  2. Load-bearing wall removed without calculation
  3. Plan does not allow another floor

FAQ

Can an old house get an extra storey?

Often yes, with a structural check and plan permission. We start with an assessment.

Can I remove a wall in my flat?

Only if it is not load-bearing, or with calculation and strengthening. We check on site.

How long does it take?

An alteration 1–2 weeks; an extension with checks 3–6 weeks.