Documentation for legalising a building in Montenegro

Many buildings in Montenegro were built without a building permit. Such property is hard to sell, mortgage or extend. We handle the technical part of legalisation: an as-built survey and a technical report to current rules.

First we assess whether the building can be legalised under the plan at all — so you don’t pay for documents with no chance of success.

What you get

  • Legalisation feasibility check
  • As-built drawings
  • Technical report
  • Structural check (if needed)
  • Filing document checklist

What we need from you

  • Property title sheet and cadastral plan
  • Photos of the building
  • Any existing documents

Stages and timing

#Stages and timing
1Plan assessment1–3 days
2Site visit and survey1–5 days
3Report5–15 days

Common mistakes and rejection reasons

  1. Building conflicts with the plan — no legalisation without changes
  2. Cadastre doesn’t match reality
  3. No proof of structural safety

FAQ

Can any building be legalised?

No. It depends on the plan and condition — that’s why we start with an assessment.

How long does the report take?

Usually 1–3 weeks after the survey.

Do you visit the site?

Yes — we or a partner in your municipality do the survey on site.

Send us your task

A paper sketch, a photo or a picture from the internet — all fine. We reply within 1 hour on working days.

Reply via